BELLEMEAT LTD.

Project title: Modernization of  meat factory (construction of three tunnels with daily capacity of 25tn ), construction of a new meat processing area and construction of new locker rooms. Total surface: 2,000m².

Brief description of technical object: Installation of electrical, strong and weak currents networks for the creation of lighting circuits, socket outlets, computer network, fire and gas detection , ventilation and air conditioning network , security network and CCTV . Electrical connection for electrical panels, electrical cooling panels and  industrial cooling systems .

Place: Menidi, Attica.

Project operator: EDEKA. S.A.

Owner of the installation: BELLE MEAT Ltd.

Norton Engineering SA

Equipped with experience, expertise and the use of high technology tools

Contact us